Hellas-Express


ex Balkanmodels Forum

Agia Aikaterini HO Project

Re: Agia Aikaterini HO Project

Postby JohnP » Thu Jun 15, 2023 7:10 pm

George this is very impressive work and such quick progress as well! Looking forward to seeing all of the next steps.

John,
Toronto
User avatar
JohnP
 
Posts: 100
Joined: Wed Jul 22, 2015 2:45 am
Location: Canada

Re: Agia Aikaterini HO Project

Postby GEORGE LARISSA » Thu Jun 15, 2023 9:01 pm

Thank you very much John!

Soon you don't say it, I have been studying it for about a year and about four months since I started the renovation work of the space and the construction of the model.
Of course I will write and post pictures as the build progresses.
User avatar
GEORGE LARISSA
 
Posts: 55
Joined: Wed Nov 02, 2022 12:07 am

Re: Agia Aikaterini HO Project

Postby fire_grisu » Sat Jun 17, 2023 7:52 am

Georg,
It is a nice room that you show us here. Also the painting is well done!

A little bit wondering to your different Level, but I am pretty sure you will explain this issue a little bit later.
fire_grisu
 
Posts: 137
Joined: Wed Nov 02, 2022 8:02 am
Location: AUSTRIA

Re: Agia Aikaterini HO Project

Postby GEORGE LARISSA » Sat Jun 17, 2023 9:02 am

Many thanks FR Manfred!
I explain this in my first post on the local topic.
I made this module 11 cm lower to create a valley between two mountain masses with two railway bridges of which the inner one will be level with the rest of the model and the outer one will be 6 cm higher, so there will be a different visual 11 and 17 cm at this point.
User avatar
GEORGE LARISSA
 
Posts: 55
Joined: Wed Nov 02, 2022 12:07 am

Re: Agia Aikaterini HO Project

Postby GEORGE LARISSA » Thu Jun 22, 2023 12:03 pm

The next task I did was to make the module that is in front of the door reclining down.
I made a wooden wall case, put a hinge of the meter below and made a slot on the top with a gap of 5 mm for the later installation of the backdrop.
IMG_20230619_101533.jpg
IMG_20230619_101512.jpg


I also installed two aluminum latches that secure the two adjacent modules.
IMG_20230620_112540.jpg
IMG_20230620_112554.jpg


I also made a yellow and black line on the outside of the module so that when someone wants to pass under it, they have to watch their head.
IMG_20230621_100421.jpg


https://youtu.be/NDQaPA80wN4
User avatar
GEORGE LARISSA
 
Posts: 55
Joined: Wed Nov 02, 2022 12:07 am

Re: Agia Aikaterini HO Project

Postby GEORGE LARISSA » Mon Jun 26, 2023 3:12 pm

Yesterday I did an initial preview of the backdrop.

First I cut and pre-drilled 2×5 aluminum corner pieces and placed them on the back of the woodwork of the modules with a 4mm gap for the backdrop to sit in.
IMG_20230625_224234.jpg
IMG_20230625_224205.jpg
The material I used is 4mm flexible marine wood so it curves around the corners and for the whole surface it took 4 pieces about 2.2m long and 49cm high.
IMG_20230625_170142.jpg
IMG_20230625_170133.jpg
IMG_20230625_170125.jpg
IMG_20230625_170110.jpg
IMG_20230625_170103.jpg
IMG_20230625_170054.jpg

I will then remove the leaves, place alignment and interlocking slats on the back and paint them sky blue for now, in the future I will decide whether to paint it or use photo shop editing.
User avatar
GEORGE LARISSA
 
Posts: 55
Joined: Wed Nov 02, 2022 12:07 am

Re: Agia Aikaterini HO Project

Postby fire_grisu » Tue Jun 27, 2023 1:51 pm

Another well done with the background!
I like them as your whole project! nice is also the raster on the wood plates. It helps a lot by placing the things on the correct postition!

I hade some time on Sunday but I took it for my Project around the house. But hopefully after all this work I can go on with my Larissa!

FR
Manfred
Last edited by fire_grisu on Thu Jun 29, 2023 4:25 pm, edited 1 time in total.
fire_grisu
 
Posts: 137
Joined: Wed Nov 02, 2022 8:02 am
Location: AUSTRIA

Re: Agia Aikaterini HO Project

Postby GEORGE LARISSA » Wed Jun 28, 2023 3:57 pm

Thank you very much Manfred!

Don't worry, the hobby should be developed slowly and with a clear mind, the rest of the work will always come first, and from now on I have some pending work and the layout will wait a bit.
User avatar
GEORGE LARISSA
 
Posts: 55
Joined: Wed Nov 02, 2022 12:07 am

Re: Agia Aikaterini HO Project

Postby GEORGE LARISSA » Sat Sep 23, 2023 10:06 pm

After almost three months of inactivity in the construction of the layout I say to start tomorrow timidly timidly with some work, but I said to put the first train on it today at least with temporary lines.
I hope it's lucky!

IMG_20230923_212016.jpg

IMG_20230923_212037.jpg
User avatar
GEORGE LARISSA
 
Posts: 55
Joined: Wed Nov 02, 2022 12:07 am

Re: Agia Aikaterini HO Project

Postby fire_grisu » Sun Sep 24, 2023 10:12 am

Nice to hear from you.
As the news I was afraid and hoping everybody is OK from you.

These temporary layout are naccessary to get the happiness about moving trains.
The blue 320 is grate to see also without fafour livrey of my.

There are a lot of refrigerator in your collection!

Well done!
fire_grisu
 
Posts: 137
Joined: Wed Nov 02, 2022 8:02 am
Location: AUSTRIA

PreviousNext

Return to Members Modelling Projects, Layouts & Collections

Who is online

Users browsing this forum: No registered users and 1 guest